Highland East-West Connector History

This post was originally developed to support a May 26, 2016 with Representative Kennedy and Senator Dayton, where the East-West Connector road was be discussed. As the road was opened on May 15th I’ve updated the document to reflect the important milestones since 2016 that led to the completion of the project. 

For over 40 years an East-West Corridor road has been a part of Highland’s Master Plan. The 1980 Master Street Plan below shows two alternate routes (highlighted in yellow).

1980-06-13 Street Master Plan

Friday, January 31, 2020

2019 Road Projects Review

Road WorkWe completed 2.2 miles of rehabilitation (orange on map below) and 5.8 miles of preservation projects (yellow)) during 2019 at a cost of ~$1M. Five rehabilitation and one preservation projects were delayed for one year (red). Some of the money from those projects was applied to twelve preservation projects previously scheduled for 2020 which we were able to complete early. The remaining money was held to help fund 2020 projects. Note, 22 other preservation projects originally scheduled for 2019 were completed in prior years.

Saturday, October 19, 2019

Traffic Count and Speed Analysis for Canal Blvd at 5625 West

2019-09-26 Canal Blvd and 5625 W

We collected traffic data and speed information on Canal Blvd from Sept 10th through Sept 26th 2019. The primary purpose of this data collection was to measure the impact on Canal Blvd due to the closure of 9600 N at Alpine Hwy. The short story is that the closure added between 400 and 500 trips per day to the current 1,000 trips a day. Note, Canal Blvd is a designed collector road that can readily accommodate`4,000 to 5,000 trips a day.

Sunday, October 13, 2019

Highland Traffic and Speed Count Summary

Road-Tube-Class

Traffic in Highland is a concern and will continue to be as the city finishes build out. Our population is approaching 20,000. At build out it looks like we may reach 25,000. In an effort to provide accurate traffic information to residents I have shared information about traffic counts taken at different locations over the last two years. This post compares the results of those counts.

Wednesday, October 9, 2019

Traffic Count and Speed Analysis for 10400 N at 5750 W

2019-09-05 10400 N and 5750 W

We collected traffic data and speed information on 10400 N from August 21st through September 5th 2019 at 5750 W (see red markers above).

Tuesday, October 8, 2019

Traffic Count and Speed Analysis for 6000 W at 9760 N

2019-09-04 6000 W and 9770 N

We collected traffic data and speed information on 6000 W from August 21st through September 4th 2019 at 9760 N (see red markers above).

Friday, August 23, 2019

Traffic Count and Speed Analysis for 9600 N at 5900 W

2019-07-31 9600 N and 5900

We collected traffic data and speed information on 9600 N from July 16th through July 30th 2019 at 5900 N (see red markers above).

Friday, March 22, 2019

Traffic Count and Speed Analysis for Canal Blvd at 5800 West

2019-03-20 Canal Blvd and 5800 W

When I ran for office in 2017 I spoke with a resident who lived on Canal Blvd and had concerns about speed. I committed to asking staff to do a traffic count and speed analysis. Staff did and I provided the summary  information they gave me to the resident. Residents are again expressing concern about traffic issues and potential traffic issues on Canal Blvd with the impending expansion of Canal Blvd to the East (the East-West connector) so I thought I would share the traffic information we collected in a more useful form. Note, I’ve probably spent over 20 hours putting this information together.

Thursday, February 21, 2019

Highland City: 2018 in Review

2019-02-20 progress2018 was a busy year for staff and elected officials. We made a lot of progress in multiple areas. I’ve reviewed what transpired and highlighted those items that I believe were the most impactful and/or newsworthy. I’ve organized these by general categories. The last is “Highland in the News”. We received a lot of good coverage this year from local media and were even mentioned in a USA Today article.

Communication:

  • Staff implemented a short report called the “City Council Brief.” These are published and shared on the city website and Facebook page within a few days of any council meeting. The brief contains a short descriptions of actions taken by the council and includes a link to a spreadsheet that shows all votes cast by each member of council since Jan 2018.

Saturday, February 16, 2019

Highland City 2018 Road Projects Review

Road WorkDuring 2018 we executed the first year of our 7-year road rehabilitation and preservation plan. A few changes were made to the scheduled projects due to changing circumstances as shown below. Our big project for the year, 6000 W, was completed on time but ran overbudget ($200,000) when we discovered that the asphalt on the north end was 2 inches thinner than we realized and the road base adjacent to Highland Elementary School was deficient. In spite of this we finished the year $17.3K  over our $1.5M budget (1.2% ). Not bad!

Saturday, October 14, 2017

East-West Connector–What Can You Do Today?

Background

The East-West or Murdock Connector is a road which has been under discussion for about 40 years. When built, it will connect N. County Parkway (4800 W) with Alpine Hwy (5300 W) south of Lone Peak High School.

Monday, July 10, 2017

16-May-2017: Funding Road Rehabilitation

2017-05-17 Highland Road - All Segments

Fifteen residents attended the meeting. Not many considering the nature of the conversation, the Road Fee.

APPEARANCES

Saturday, April 15, 2017

Murdock Connector: An Analysis of the 2017 Traffic Study

Another milestone was reached last month when a road study was completed on impact of constructing an East-West Connector. Below is a brief summary of the report, my analysis of the information provided, and suggestions on how you can impact the decision going forward. According to the study (click here to see the report).

  • 80% of the traffic on a connector would be local traffic while 20% would be commuter.
  • While all of the proposed routes have a positive impact on traffic, the central option has the best overall long term impact.
  • All connector options would reduce traffic on both SR-92 and 700 N in American Fork.

2017-04-14 Connector Options

There are issues with each of the locations for a connector which were analyzed (see the map above).

Tuesday, January 24, 2017

City Council 10-Jan-2017: Road Plan, Youth Council, R-1-30 Moratorium, Spring Road Projects,

If you support the construction of the Murdock Connector (an east-west road between Alpine Highway and North County Blvd) please indicate your support by signing an online petition (click here to sign). This petition will be shared with Utah State legislators as they will need pass a bill this year to allow the road to cross state owned property. Also, our new State Senator, Dan Hemmert, and State Representative, Mike Kennedy, both have short constituent surveys that include a question on this issue. Please let them know how you feel on this and other issues such as education, internet sales tax, medical marijuana …. Click on their respective pictures to complete their survey’s .

Dan Hemmert - 1 Mike Kennedy - 1
State Senator Dan Hemmert State Rep. Mike Kennedy

Now on the the meeting. It was a productive meeting with a good exchange of information. Two residents attended the Roads Work Session and over sixty were present for the Council Meeting. Most of the Council Meeting attendees were there to support the 2017 Highland City Youth Council members who were sworn in. It is great to see so much interest in local government.

Friday, January 6, 2017

City Council 6-Dec-2016: Cemetery Work Session, Murdock Connector Resolution, Open Space Maintenance Agreement

Sixteen residents and others attended the council meeting none were at the work session.

2016-12-06 Cemetery

Work Session: Cemetery perpetual Care fund

The Cemetery Fund currently has a balance of $10,000. Plot fees are presently being used to refund the city for the purchase of the cemetery land. The goal of a perpetual care fund would be to build up a balance that would generate enough interest to cover all or most of the cost of maintaining the cemetery. Matt Millis, Zion Bank, walked us through multiple scenarios for increasing the lot and burial fees in order to reach a fund balance that would be self-sustaining. We generally agreed to build a balance to that would cover some of the maintenance cost of the cemetery. The fees needed to be reviewed periodically. We felt that the city should pay some portion of the costs as the cemetery does fill a “park role” for some residents. The estimated percentage of “park”  was not fixed (10% to 15% was discussed). Staff will work with Mr. Millis to further refine the model and finalize initial fee recommendations. These would need to be approved at a future council meeting. Click here to review the presentation we were given.

Thursday, December 1, 2016

City Council 1-Nov-2016: Road Repair Plan Work Session

2016-11-01 Road Distress

Background: In 2011 a road study was begun which ended up projecting that the cost of repairing Highland’s D & F rated roads would be $16.2M. As the sturdy was reviewed by staff, residents, and council members a number of issues were uncovered which council and staff felt warranted a second opinion.

Earlier this year we executed a contract with PEPG Consulting to reassess C- through F rated roads in Highland using a core sampling methodology. Coring gives engineers a much better ability to assess the condition of a road segment and recommend an appropriate treatment. While the study was underway a committee composed of residents, staff members, and council members met monthly with PEPG to review the progress and provide input. I really appreciate those who participated.

Monday, June 27, 2016

Highland Road Study Open House Review

2016-06-23 Env v Struct Distress

On May 23rd the city held an open house to review the outcome of a recent road evaluation study we commissioned. Below are copies of the poster boards which were on display along with some short comments.

Friday, May 27, 2016

Issues and Information 26-May-2016: East-West Connector and State Land, a Discussion with Senator Dayton

2014-02 USDC Road HierarchyThanks to those who attended the meeting last night, especially, Senator Margaret Dayton, Rep Mike Kennedy, Rep Kay Christofferson, and State Auditor John Dougall. I counted over 60 people in attendance. Lots of questions were asked, most were answered, and everyone was very respectful.

For a background on some of the history related to the land and the east-west connector please see my earlier post entitled  “Highland East-West Connector History“.

Thursday, May 19, 2016

City Council 19-Apr-2016: Roads Work Session, Spring Creek Park–Sell Land, R-1-30 Zone …

Highland Mitchell ParkAbout 65 people attended the meeting. At least half were there to speak during the public hearing on whether or not to declare the 12 acres that comprise the undeveloped Spring Creek Park as surplus. This was an interesting discussion.

Roads Work session

We reviewed the work to date on the road study. PEPG confirmed that their final report would include an estimated timeframe the work should be done to a road after which the cost to repair would increase. Click here to view a copy of the presentation made by PEPG. Their general findings were that:

Wednesday, February 24, 2016

City Council 16-Feb-2016: Utility Rates, Park Land Purchase, 11800 N/Highland Blvd …

ArgueThere were 15+ people at the meeting. Not sure if it was because I was still recovering from the flue and that the meeting ran from 6 pm to nearly midnight but I managed disagree at some point with all presenters but one, plus all those offering public comment, all councilmen, and the mayor. I think that has to be a record of some sort. We held a one hour work session focused on the utility rate study followed by a 4+ hr. council meeting. Here is a brief summary of my disagreements. You’ll of course want to read the details that follow.

  • Challenged the Zion’s bank representative on information he presented during the Utility Rate Study progress report.